Film production worksheets
AI Video Generation Cost Calculator
A finished minute is not a generated minute. Estimate the shots, discarded takes and billable seconds behind your film using the current price you have verified in your generator.
Free to plan in your browser. No account, upload or model call is needed here; generating assets in other workspaces may require a plan and credits.
Budget for accepted footage, including retries
Use your own current unit price. The starting durations and attempt counts are editable planning assumptions, not model limits or observed success rates. Nothing is generated or purchased. Edits are not saved after a refresh; if you arrived from a planning link, refreshing restores that link's numeric assumptions.
No estimate yet. Complete or correct the fields above; a missing price is not treated as zero.
Formula and limits
Duration mode: shots = ceil(target runtime ÷ usable seconds per shot). Exact-count mode: use your planned shot count unchanged and derive average usable duration = runtime ÷ count. Initial attempts = shots; additional retries = shots × (attempts per shot − 1). Generated seconds = all billable attempts × generated seconds per attempt.
Generation cost = generated seconds × USD/second; or attempts × USD/attempt; or attempts × credits/attempt × USD/credit. Initial generation and additional retries use that same rate. Project total = (initial generation + retries + upscaling + editing + other project costs) × (1 + contingency ÷ 100).
This worksheet assumes equal-length generations, one approved take per shot and no footage reuse between shots. It does not predict which attempt will be accepted. Every listed attempt is counted as billable; failed-job charges, refunds, minimum billable units, packs and subscription allowances vary by provider.
Use prices and credit quotes for the actual model, resolution, duration and plan. A planning total is not a spending cap. Review the final charge in the live generator before you submit a request.
The studio opens separately so this budget stays available. No budget, prompts or project data are automatically transferred; review the existing sign-in, plan, model and credit requirements before generating. Copy or download your estimate before closing this tab.
Before you start production
Are these live model prices?
No. Enter a current price from your selected provider or the live generator. The calculator does not fetch pricing, perform currency conversion, charge credits or make a binding quote.
Can I use the exact shot count from my production plan?
Yes. Select the known-shot-count mode, or open the calculator from the Film Production Planner. The handoff includes only numeric budget assumptions and billing choices, not your script or character details. Verify the imported values before relying on the estimate.
Why can generated seconds exceed the final running time?
Each shot may need several takes, and a generated clip may contain seconds that do not make the edit. Duration-based planning rounds up to whole shots; known-shot-count mode uses your exact count. Both scenarios bill the full generated duration for every assumed attempt.
Does a retry scenario predict quality or guarantee enough budget?
No. Both scenarios are assumptions you choose. Minimum billing, rejected generations, refunds, taxes, subscriptions and unused credits vary by provider. Check the actual terms and account for costs outside this estimate.
From planning to delivery
These next steps open in new tabs to preserve your unsaved worksheet. Nothing is imported automatically.